Task Library
Put the first 6-month recursive review of the knowledge maintenance system on the calendar with named reviewers and a prep package, arming the self-improvement loop.
Category: Knowledge System Maintenance
Use this when the knowledge maintenance system goes live – this task is a gap: the first recursive review is not yet on any calendar, and an unscheduled recursive loop is a loop that never starts.
Inputs
- The adoption date of the maintenance system (sets the 6-month mark)
- Team calendar and roster (a review lead plus a senior reviewer)
- Locations of the evidence sources: status table, SOP Amendment tracker, Knowledge Capture location
Steps
- Set the date six months out from the system's adoption. Pick a real date now and defend it – "in about six months" is how recursive reviews become annual, then never.
- Name the reviewers: a review lead to run the cycle and a senior reviewer with authority to approve resulting amendments (the weekly SOP reviewer is the natural fit). Named people, not roles-to-be-determined.
- Create the calendar event with the agenda baked in: run
review-past-6-months-of-sop-amendment-proposals-for-patternsfirst, thenaudit-this-maintenance-article-every-6-months, then schedule the next cycle. - Attach the prep list to the invite so evidence is pulled before the session: current status table with audit dates, full amendment-tracker export, Knowledge Capture Note volume and routing stats, portability review grades.
- Confirm both reviewers accepted and the date does not collide with a quarterly audit crunch – the recursive review needs attention, not leftovers.
- Record in the hub's audit record that the cycle is armed: date, reviewers, agenda link. From here on, each review schedules its successor before closing – this skill only fires the first shot.
Definition of done (QA checklist)
- A specific date ~6 months from adoption is on the team calendar, accepted by a named lead and a named senior reviewer
- Agenda embeds the two Process 5 skills in run order plus "schedule the next cycle"
- Prep list attached covering status table, amendment tracker, capture stats, and portability grades
- The armed cycle recorded in the hub's audit record (date, reviewers, agenda)
- Linked back to the definitive article and relevant siblings
- Complies with Blog Posting Guidelines (if it publishes content)
Example(s)
- /knowledge-system-maintenance – Process 5 requires putting the first recursive review on the calendar with assigned reviewers. Gap: not yet scheduled – running this skill closes the gap.
- Example needed – run the Meta-Article Prompt (/meta-article-prompt-template) after the first review actually convenes and link the meta-article here.
File in the zip: skills/knowledge-system-maintenance/schedule-first-6-month-recursive-review.md. Download the Task Library zip.
Index: Task Library. Article guidelines.
